Fluor - Welder Resume Example

Love this resume? Build your own now

Leah Long
XXXX XXXXXX XXXX, Halifax, VA 24558
XXXXXXXXXXXXXXXXXXXXXX
Ph: XXXXXXXXXXXX
Professional Summary

Accomplished and energetic foreman with a solid history of achievement in power plant construction. Motivated leader with strong organizational and prioritization abilities. Areas of expertise include welding, pipe fitting and leadership.With more than 15 years of experience in fast-paced industrial environment. Experienced as a Pipe General Foreman, Pipe Foreman, Certified Pipe Welder and Fitter.Additional experience in punch list coordination, hydro testing, ordering material and working in an efficient and safe manner.

Skills
  • Installation
  • Mathematics
  • Instructing
  • Judgment and Decision Making
  • Complex Problem Solving
  • Time Management
  • Coordination
  • Critical Thinking
Experience
Welder/ Foreman Sep 2014Present Fluor Brunswick Co., Va
  • Supervise, coordinate, or schedule the activities of construction or extractive workers.
  • Coordinate work activities with other construction project activities.
  • Assign work to employees, based on material or worker requirements of specific jobs.
  • Analyze worker or production problems and recommend solutions, such as improving production methods or implementing motivational plans.
  • Record information such as personnel, production, or operational data on specified forms or reports.
  • Weld components in flat, vertical, or overhead positions.
  • Weld separately or in combination and other alloys.
Pipe Fitter /Hydro May 2014Sep 2014 PCL Construction Roxboro, Nc
  • Locate system by using P&ID's, isometric and plan drawings to be tested.
  • Set up system for test using isometric drawings installing blinds, fill points, drains and test boundaries.
  • Keep records of customer interactions or transactions, recording details of inquiries.
  • Check to ensure that appropriate changes were made to resolve customers' problems.
  • Complete contract forms and signed off by appropriate personal.
  • Inspect, examine, or test installed systems or pipe lines, using pressure gauge, hydrostatic testing, observation, or other methods.
General Foreman Oct 2013May 2014 SI Saulsbury Minden, La
  • Supervise, coordinate, or schedule the activities of construction or extractive workers.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met.
  • Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment.
  • Estimate material or worker requirements to complete jobs.
  • Coordinate work activities with other construction project activities.
  • Order or requisition materials or supplies.
  • Assign work to employees, based on material or worker requirements of specific jobs.
  • Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities.
  • Plan pipe system layout, installation, or repair, according to specifications.
  • Assemble or secure pipes, tubes, fittings, or related equipment, according to specifications, by welding, brazing, cementing, soldering, or threading joints.
Pipe Foreman May 2013Oct 2013 Zachry Construction Front Royal, Va
  • Supervise, coordinate, or schedule the activities of construction or extractive workers.
  • Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met.
  • Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment.
  • Estimate material or worker requirements to complete jobs.
  • Assign work to employees, based on material or worker requirements of specific jobs.
  • Order or requisition materials or supplies.
  • Analyze worker or production problems and recommend solutions, such as improving production methods or implementing motivational plans.
  • Plan pipe system layout, installation, or repair, according to specifications.
Pipe Fitter Feb 2013May 2013 SI Saulsbury Mansfield, La
  • Plan pipe system layout, installation, or repair, according to specifications.
  • Assemble or secure pipes, tubes, fittings, or related equipment, according to specifications, by welding, brazing, cementing, soldering, or threading joints.
  • Measure and mark pipes for cutting or threading.
  • Lay out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
  • Remove and replace worn components.
Pipe Fitter Lead May 2012Feb 2013 FSE South Boston, Va
  • Plan pipe system layout, installation, or repair, according to specifications.
  • Assemble or secure pipes, tubes, fittings, or related equipment, according to specifications, by welding, brazing, cementing, soldering, or threading joints.
  • Measure and mark pipes for cutting or threading.
  • Lay out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities.
Boilermaker Feb 2012May 2012 DZ Atlantic Mansfield, La
  • Bolt or arc weld pressure vessel structures and parts together, using wrenches or welding equipment.
  • Inspect assembled vessels or individual components, such as tubes, fittings, valves, controls, or auxiliary mechanisms, to locate any defects.
  • Examine boilers, pressure vessels, tanks, or vats to locate defects, such as leaks, weak spots, or defective sections, so that they can be repaired.
  • Install manholes, handholes, taps, tubes, valves, gauges, or feedwater connections in drums of water tube boilers, using hand tools.
  • Study blueprints to determine locations, relationships, or dimensions of parts.
  • Locate and mark reference points for columns or plates on boiler foundations, following blueprints and using straightedges, squares, transits, or measuring instruments.
Structural Fitter/ Punch LIst Foreman May 2011Feb 2012 Shaw Group St. Paul , Va
  • Position, align, fit, and weld parts to form complete units or subunits, following blueprints and layout specifications, and using jigs, welding torches, and hand tools.
  • Align and fit parts according to specifications, using jacks, turnbuckles, wedges, drift pins, pry bars, and hammers.
  • Study engineering drawings and blueprints to determine materials requirements and task sequences.
  • Coordinate all fixes on a punch list.
Boilermaker Jan 2011Apr 2011 DZ Atlantic Lafayette, La
  • Bolt or arc weld pressure vessel structures and parts together, using wrenches or welding equipment.
  • Examine boilers, pressure vessels, tanks, or vats to locate defects, such as leaks, weak spots, or defective sections, so that they can be repaired.
  • Repair or replace defective pressure vessel parts, such as safety valves or regulators, using torches, jacks, caulking hammers, power saws, threading dies, welding equipment, or metalworking machinery.
  • Inspect assembled vessels or individual components, such as tubes, fittings, valves, controls, or auxiliary mechanisms, to locate any defects.
Pipe Fitter Feb 2010May 2010 Zachry Construction Crystal River, Fl
  • Plan pipe system layout, installation, or repair, according to specifications.
  • Select pipe sizes, types, or related materials, such as supports, hangers, or hydraulic cylinders, according to specifications.
  • Measure and mark pipes for cutting or threading.
  • Lay out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
  • Assemble or secure pipes, tubes, fittings, or related equipment, according to specifications, by welding, brazing, cementing, soldering, or threading joints.
Foreman/ Welder Jun 2003Dec 2009 Conner Construction Halifax, Va
  • Supervise, coordinate, or schedule the activities of construction or extractive workers.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met.
  • Coordinate work activities with other construction project activities.
  • Estimate material or worker requirements to complete jobs.
  • Order or requisition materials or supplies.
  • Weld components in flat, vertical, or overhead positions.
  • Weld separately or in combination, using aluminum, stainless steel, cast iron, and other alloys.
Boiler Operator Jun 1999May 2003 JM Huber Corp. Crytsal Hill, Va
  • Press and adjust controls in order to activate, set, and regulate equipment according to specifications.
  • Monitor equipment operation, gauges, and panel lights in order to detect deviations from standards.
  • Calculate amounts of materials to be loaded into furnaces, adjusting amounts as necessary for specific conditions.
  • Read and interpret work orders and instructions in order to determine work assignments, process specifications, and production schedules.
  • Record gauge readings, test results, and shift production in log books.
  • Confer with supervisors or other equipment operators in order to report equipment malfunctions or to resolve production problems.
Education
High School Diploma Jun 1999 Halifax County High School Halifax, Va

People also search for

Structural Metal Fabricators and Fitters

Lakeland ,Florida

Ava Rogers

Companies Worked For:

Layne Christensen , SMCI

JobTitles Held:

Structural Metal Fabricators and Fitters , Leadman

Assembler

Tampa ,Florida

Jonathan Evans

Companies Worked For:

Generic Pontential Inc , Pollo Tropical

JobTitles Held:

Assembler , Grill

Welder

Carrollton ,Ohio

Olivia Sanchez

Companies Worked For:

Manufacturing Concepts , N

JobTitles Held:

Welder

Petroleum Supply Specialist

Connellsville ,Pennsylvania

Christopher Lopez

Companies Worked For:

United States Army , Jeanette City Transit

JobTitles Held:

Petroleum Supply Specialist , Mechanic

resume flower ad

About this resume

Welder FROM Halifax , Virginia RESUME

This is a resume for a Welder in Halifax, Virginia with experience working for such companies as Fluor and PCL Construction. The grade for this resume is 0 and is one of hundreds of Welder resumes available on our site for free. Use these resumes as templates to get help creating the best Welder resume.

Dude
School Attended
Halifax County High School