Foremost Paving - Road Construction Resume Example

Love this resume? Build your own now

Wyatt Scott
XXXX XXXXXXX XX, Donna , TX 78537
Ph: XXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXX
Professional Summary

Responsible work ethic proficient in mechanical work and general construction. Passionate and motivated, with a drive for excellence.

Service-oriented during years of employment. Core competencies as well as excellent communication and time management skills. Handles tasks with accuracy and efficiency.

Skills
  • Operation and Control
  • Building and Construction
  • Mechanical
  • Troubleshooting
  • Coordination
  • Equipment Maintenance
  • Active Learning
  • Critical Thinking
Experience
Road Construction Aug 2014Present Foremost Paving Elsa, tx
  • Learn and follow safety regulations.
  • Take actions to avoid potential hazards or obstructions, such as utility lines, other equipment, other workers, or falling objects.
  • Locate underground services, such as pipes or wires, prior to beginning work.
  • Locate underground services, such as pipes or wires, prior to beginning work.
  • Monitor operations to ensure that health and safety standards are met.
  • Adjust handwheels and depress pedals to control attachments, such as blades, buckets, scrapers, or swing booms.
  • Coordinate machine actions with other activities, positioning or moving loads in response to hand or audio signals from crew members.
  • Signal operators to guide movement of tractor-drawn machines.
  • Repair and maintain equipment, making emergency adjustments or assisting with major repairs as necessary.
  • Perform specialized work, using equipment such as pile drivers, dredging rigs, drillers, or concrete pumpers.
Tile Setter Sep 2013Aug 2014 Self-Employed Donna, tx
  • Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
  • Align and straighten tile using levels, squares and straightedges.
  • Lay and set mosaic tiles to create decorative wall, mural and floor designs.
  • Prepare cost and labor estimates based on calculations of time and materials needed for project.
  • Determine and implement the best layout to achieve a desired pattern.
  • Measure and mark surfaces to be tiled, following blueprints.
  • Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
  • Study blueprints and examine surface to be covered to determine amount of material needed.
  • Cut, surface, polish and install marble and granite or install pre-cast terrazzo, granite or marble units.
  • Apply mortar to tile back, position the tile and press or tap with trowel handle to affix tile to base.
  • Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
  • Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
  • Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat onto a metal screen.
  • Apply a sealer to make grout stain- and water-resistant.
  • Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
Floor Hand Aug 2010Sep 2013 Helmerich & Payne Alice, TX
  • Inspect derricks, or order their inspection, prior to being raised or lowered.
  • Inspect derricks for flaws, and clean and oil derricks in order to maintain proper working conditions.
  • Control the viscosity and weight of the drilling fluid.
  • Repair pumps, mud tanks, and related equipment.
  • Set and bolt crown blocks to posts at tops of derricks.
  • Listen to mud pumps and check regularly for vibration and other problems, in order to ensure that rig pumps and drilling mud systems are working properly.
  • Start pumps that circulate mud through drill pipes and boreholes to cool drill bits and flush out drill-cuttings.
  • Position and align derrick elements, using harnesses and platform climbing devices.
  • Prepare mud reports, and instruct crews about the handling of any chemical additives.
  • Clamp holding fixtures on ends of hoisting cables.
  • Steady pipes during connection to or disconnection from drill or casing strings.
Education
High School Diploma : General May 1988 Donna ISD Donna, TX

People also search for

Road Construction

Donna ,Texas

Wyatt Scott

Companies Worked For:

Foremost Paving , Self Employed

JobTitles Held:

Road Construction , Tile Setter

Road construction

Baton Rouge ,Louisiana

Anthony Walker

Companies Worked For:

Ammon staffing , Feed the needy of greater BR

JobTitles Held:

Road construction , Loader

road construction flagger

Blanchard ,Michigan

Jackson Thompson

Companies Worked For:

Access point , Grondins hair care

JobTitles Held:

road construction flagger , hair stylist

Machinist

cedartown ,Georgia

Andrew King

Companies Worked For:

advance storage , ceva logistics

JobTitles Held:

Machinist , Forklift Operator

resume flower ad

About this resume

Road Construction FROM Donna , Texas RESUME

This is a resume for a Road Construction in Donna, Texas with experience working for such companies as Foremost Paving and Self Employed. The grade for this resume is 0 and is one of hundreds of Road Construction resumes available on our site for free. Use these resumes as templates to get help creating the best Road Construction resume.

Dude
School Attended
Donna ISD